Changing a couple steps

This floor was dropped from floor joist to a slab in a prior renovation. Earlier I extended the steps the stair well to the right lands on, so there is a common elevation as the soon to be serviceable bathroom you see in the back ground. Now the two 4 feet of steps you see running down the center of the picture will be removed. As it is now to get to the storage under the stairwell you must step up then bend over or reach out across them. 
When the floor is ripped up a drain pipe that can not be moved easily is found. The concrete will have to be raised 1 3/4 inch with out making a step hazard after the joist are clipped. 
The tiles on the bottom of the picture show a nice big wave in the existing floor. I will use this to blend every thing together in a single poor. Luckily the traffic runs as we see and off to the left of the picture.
A turn and a return will make a comfortable step in two directions. The framing will be glued directly to the new concrete slab. The riser on the right acts as the former for the slab.

 
A stop is clued and pinned to the last return tread for quick easy and super strong product.
 
                                   


 

Most people walk side to side not to and fro in the picture above.



Thursday, February 6, 2014

Barrier free bathroom deck.

 
A barrier free bath room.
 
                                             
                                                The band and post support are reworked

 
                                                          Feed and drain plumbing

 
                                                          The band line is found


                                                                       

 
Work


                                                                   

 
And more work



 
To make it perfect


 
Some times its frustrating



 
But it always looks good in the end of each phase

 
This is a sealant that concrete will go on.

 
More plumbing



 
Now comes concrete


 
And glass block walls


 
Follow my Blog to see the end result

Tin ceiling tiles I once worked on.


 
The main ceiling diameter is just less then two ceiling tiles so half the difference is clipped of all the tiles at once so the main seem runs down the center of the room.


 










I was able to make the shower pipe come right down throw the tile so it is centered on the design.

 
                                       The last couple of tile usually take special trimming .


                                  
                                                        The job is not quite finished